PROJECT DESCRIPTION
Inovateus Solar completed in 2017 one of the largest utility owned solar farms East of the Mississippi River for DTE Energy. This 58 MWDC solar farm is located 58 miles North of Detroit in Lapeer, MI. The project consists of two sites totaling 267 acres and provides 80 GWh of energy annually.
Inovateus managed the turnkey construction of the project which included engineering, procurement and logistics for major equipment, and project management.
Details
Project Completion Date — 2017
Designed Annual Output — 77,852 MWh
Rated System Size — 58 MW (DC)
Panel Type — (68,780) Canadian Solar CS6X-320P • (111,872) Canadian Solar CS6X-320P • (7,398) Suniva OPT335-72-4-100
Racking System — Solar Flex Rack
Inverter — (71) Schneider XC 680 NA • (68) SMA 30000TL-US