Lake Prairie Elementary – Tri Creek Schools

Lowell, Indiana

PROJECT DESCRIPTION


In September 2017, Inovateus Solar partnered with Midwest Wind and Solar to provide renewable solar power to three middle schools in the Tri Creek School Corporation. The three solar arrays needed to be completed in 2017 in order to make it under the net metering policy change by Senate Bill 309. The project was initially proposed to the school by the students who wanted to save on energy expenses, as well as reduce the schools carbon footprint.

Our partner Midwest Wind and Solar did an excellent job with the construction of this system, while Inovateus Solar was able to support the project with material procurement. Tri Creek will now have a solar array to offset their power usage for the next 25 plus years.

Details

Project Completion Date — 2017

Rated System Size — 285 kWdc

Panel Type — (864) 330W Hannah Q-Cell

Racking System — Patriot Solar Group

Inverter — (10) Fronius Symo

Installation Contractor — Midwest Wind and Solar

Image
Image